The set of design guidelines that have been established applies to all cottages
to be constructed at Filion Lake Resort.
The sole purpose of these standards is to create an aesthetically pleasing and consistent
community, a sense of pride of ownership, and ultimately, an increased future property
values.
1. Standard for Development of Cottage Subdivided Lots
These standards reflect the requirements for development and do not take Precedent
over municipal bylaws governing lot or building development.
Site Development:
No construction will be allowed to commence prior to issuance of a Building Permit
from The Rural Municipality of Canwood. This applies to cottages, boathouses, docks
or any outbuildings. The Purchaser will be responsible for constructing lot approaches
and installing culverts in approaches, which may hinder natural water flow. Mobile
homes, modular homes and / or trailers are unacceptable as permanent residences,
nor allowed for extended durations to be placed on a lot for any purpose other than
construction purposes. Prefabricated buildings of new construction designed as a
cottage or Summer home and moved onto the lot from there places of erection are
allowed, but shall specifically exclude any buildings or construction not originally
designed as a cottage or Summer home, which has been previously erected and occupied
on another location. The Seller and or the community Hamlet will provide a site
with access for storing sufficient garbage containers to accommodate pick-up for
the subdivision. The cost of pick-up service will be paid for by the purchasers
through an agreement with the municipality.
2. Building Design Standards
(a) Set-back and Property Size
All dwellings are subject to a minimum floor space of 960 sq ft main floor area.
Height restrictions to be one and one half story on lake front only. Lake view and
third row exempt from this restriction. Minimum set back to be 1.5m (4.92’) from
side property boundaries with trees to be reserved or replaced with foliage of choice.
. The Purchaser MUST, before building any residence, maintain a finished floor elevation
of 513.40 feet above sea level.
b) Building Commitment
Once the construction phase starts (digging of the foundation or basement) the Exterior
of the Cabin / Cottage must be fully completed within 18 months from that start
date.
c) Exterior Appearance and Design
. The exterior components, i.e. windows, doors, roof lines should be arranged in
an aesthetically pleasing manner
d) Building Materials
. Follow the selection of materials, but lean heavily towards the expression of
natural materials. The use of asphalt shingles in cedar tones is highly encouraged.
Log style architecture is very desirable.
. The principle of harmony to nature rules out monumental architecture, but does
not prevent a good individual design.
e) Colors
. Earth tones of light and dark intensity
f) Fences
. Fences are discouraged, but are allowed to a maximum of 4 ft. in height with a
vertical expression
3. Plumbing
. All drainage or plumbing installed, reconstructed or extended in any building
shall be in accordance with the provisions of The Public Health Act and the regulations
there under. Single chamber sewage holding tank with sewage to be removed by septic
service, approved by the Department of Public Health, Prince Albert. Fiberglass,
or Concrete containers are adequate.
. There shall not be any discharge of any water from any drain within any building
unless the discharge is to a sewage holding tank as provided above.
. In the event that a sewage system is ever established to serve the property covered
by this agreement, the purchaser covenants to hook up such system months of it being
available, and to pay all rates levies or taxes assessed by the Local Municipal
Government or its successors with respect thereto.
4. Electrical Wiring and Equipment
. All electrical wiring and equipment for light, power or heat in any building shall
be installed in conformity with the Electrical Inspection and Licensing Act and
the latest authorized edition of the Canadian Electrical Code.
. The installation, operation and maintenance of all sanitary facilities shall conform
to the regulations of the Department of Public Health.
5. Additional Information
Services Provided to the Purchaser
. Subdivision of Roads where applicable
. Ditches and Drainage
. Traffic Signs
. Boat Ramp
. Electrical Power Service Provisions to Property Line
. Telephone Service Provisions to Property Line
. Garbage Provisions
(Natural Gas to be proposed)
6. RV Sites
RV's are allowed in designated areas.